Monte Cañón

Degraded

Galicia · Wind · 74 MW installed · 6 technicians · manager Kiarra Swaniawski

Output now

34.5 MW

Load factor

47 %

Energy today

186 MWh

Availability

96.9 %

Producing

12 / 16

Open alarms

4

Generation
Last 12 hours
Wind, solar and battery power at the point of interconnection. A charging battery shows below zero.
Conditions
Resource and grid

Wind

9.8 m/s S

Irradiance

0 W/m²

Temperature

15.6 °C

Cloud cover

70 %

Conditions

Overcast

Substation

Mesón SE 220 kV

Voltage

220.1 kV

Frequency

49.979 Hz

Power factor

0.988

Curtailment

19 %

Day-ahead price

83.61 €/MWh

Assets

16 assets on site. Open one for its live 3D view.

Power flow

Wind turbine

WTG-01

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
14%

Output

0.88 MW

Today

10.9 MWh

Wind

7.4 m/s

Wind turbine

WTG-02

Siemens Gamesa SG 6.6-170 · 4.2 MW

Producing
52%

Output

2.19 MW

Today

12.9 MWh

Wind

10.0 m/s

Wind turbine

WTG-03

Nordex N149/4.0-4.5 · 6.2 MW

Producing
17%

Output

1.07 MW

Today

18.0 MWh

Wind

7.7 m/s

Wind turbine

WTG-04

Siemens Gamesa SG 5.0-145 · 5.0 MW

Producing
94%

Output

4.68 MW

Today

13.4 MWh

Wind

12.9 m/s

Wind turbine

WTG-05

Nordex N149/4.0-4.5 · 6.2 MW

Producing
53%

Output

3.27 MW

Today

17.8 MWh

Wind

10.3 m/s

Wind turbine

WTG-06

Vestas V162-6.2 · 5.0 MW

Producing
90%

Output

4.51 MW

Today

13.0 MWh

Wind

13.0 m/s

Wind turbine

WTG-07

Vestas V162-6.2 · 4.2 MW

Curtailed
47%

Output

1.99 MW

Today

8.4 MWh

Wind

13.5 m/s

Wind turbine

WTG-08

Nordex N149/4.0-4.5 · 6.2 MW

Producing
27%

Output

1.68 MW

Today

13.0 MWh

Wind

8.4 m/s

Wind turbine

WTG-09

Vestas V150-4.2 · 6.2 MW

Producing
68%

Output

4.20 MW

Today

17.3 MWh

Wind

10.8 m/s

Wind turbine

WTG-10

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
71%

Output

4.42 MW

Today

17.8 MWh

Wind

11.2 m/s

Wind turbine

WTG-11

Siemens Gamesa SG 6.6-170 · 5.0 MW

Producing
5%

Output

0.27 MW

Today

9.9 MWh

Wind

5.9 m/s

Wind turbine

WTG-12

Vestas V162-6.2 · 5.0 MW

Standby
0%

Output

0.00 MW

Today

17.0 MWh

Wind

6.5 m/s

Wind turbine

WTG-13

Siemens Gamesa SG 5.0-145 · 4.2 MW

Producing
81%

Output

3.42 MW

Today

10.0 MWh

Wind

11.6 m/s

Wind turbine

WTG-14

Vestas V150-4.2 · 4.2 MW

Curtailed
46%

Output

1.91 MW

Today

6.3 MWh

Wind

12.5 m/s

Inverter skid

INV-01

SMA Sunny Central 4600 UP · 5.0 MVA

Producing
26%

Output

1.32 MW

Today

16.3 MWh

Availability

99.6 %

Inverter skid

INV-02

Sungrow SG3125HV-MV · 5.0 MVA

Curtailed
1%

Output

0.06 MW

Today

8.1 MWh

Availability

94.2 %

Alarms
Site alarms
Most recent events from this site's assets.

Blade ice detected

WTG-02· 10-26 02:37
Medium

IGBT temperature high

INV-02· 10-25 19:46
Low

Pitch system hydraulic pressure low

WTG-05· 10-25 12:20
Low

Yaw misalignment above limit

WTG-07· 10-25 08:01
Low