Monte Cañón

Degraded

Galicia · Wind · 74 MW installed · 6 technicians · manager Kiarra Swaniawski

Output now

22.6 MW

Load factor

31 %

Energy today

155 MWh

Availability

96.9 %

Producing

12 / 16

Open alarms

4

Generation
Last 12 hours
Wind, solar and battery power at the point of interconnection. A charging battery shows below zero.
Conditions
Resource and grid

Wind

11.2 m/s SW

Irradiance

0 W/m²

Temperature

15.3 °C

Cloud cover

39 %

Conditions

Sunny intervals

Substation

Mesón SE 220 kV

Voltage

220.6 kV

Frequency

49.995 Hz

Power factor

0.996

Curtailment

19 %

Day-ahead price

77.12 €/MWh

Assets

16 assets on site. Open one for its live 3D view.

Power flow

Wind turbine

WTG-01

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
92%

Output

5.68 MW

Today

8.7 MWh

Wind

12.8 m/s

Wind turbine

WTG-02

Siemens Gamesa SG 6.6-170 · 4.2 MW

Producing
50%

Output

2.11 MW

Today

11.4 MWh

Wind

9.9 m/s

Wind turbine

WTG-03

Nordex N149/4.0-4.5 · 6.2 MW

Producing
47%

Output

2.92 MW

Today

16.7 MWh

Wind

9.9 m/s

Wind turbine

WTG-04

Siemens Gamesa SG 5.0-145 · 5.0 MW

Producing
13%

Output

0.65 MW

Today

11.1 MWh

Wind

7.2 m/s

Wind turbine

WTG-05

Nordex N149/4.0-4.5 · 6.2 MW

Producing
10%

Output

0.64 MW

Today

14.6 MWh

Wind

6.9 m/s

Wind turbine

WTG-06

Vestas V162-6.2 · 5.0 MW

Producing
44%

Output

2.18 MW

Today

9.6 MWh

Wind

9.8 m/s

Wind turbine

WTG-07

Vestas V162-6.2 · 4.2 MW

Curtailed
4%

Output

0.16 MW

Today

7.2 MWh

Wind

6.4 m/s

Wind turbine

WTG-08

Nordex N149/4.0-4.5 · 6.2 MW

Producing
10%

Output

0.63 MW

Today

12.0 MWh

Wind

6.7 m/s

Wind turbine

WTG-09

Vestas V150-4.2 · 6.2 MW

Producing
13%

Output

0.79 MW

Today

13.7 MWh

Wind

7.1 m/s

Wind turbine

WTG-10

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
57%

Output

3.51 MW

Today

13.6 MWh

Wind

10.5 m/s

Wind turbine

WTG-11

Siemens Gamesa SG 6.6-170 · 5.0 MW

Producing
31%

Output

1.54 MW

Today

8.7 MWh

Wind

8.7 m/s

Wind turbine

WTG-12

Vestas V162-6.2 · 5.0 MW

Standby
0%

Output

0.00 MW

Today

14.8 MWh

Wind

11.9 m/s

Wind turbine

WTG-13

Siemens Gamesa SG 5.0-145 · 4.2 MW

Producing
12%

Output

0.50 MW

Today

8.3 MWh

Wind

7.1 m/s

Wind turbine

WTG-14

Vestas V150-4.2 · 4.2 MW

Curtailed
31%

Output

1.32 MW

Today

4.6 MWh

Wind

10.8 m/s

Inverter skid

INV-01

SMA Sunny Central 4600 UP · 5.0 MVA

Producing
70%

Output

3.50 MW

Today

12.2 MWh

Availability

99.6 %

Inverter skid

INV-02

Sungrow SG3125HV-MV · 5.0 MVA

Curtailed
44%

Output

2.20 MW

Today

6.2 MWh

Availability

94.2 %

Alarms
Site alarms
Most recent events from this site's assets.

Blade ice detected

WTG-02· 10-26 01:39
Medium

IGBT temperature high

INV-02· 10-25 18:48
Low

Pitch system hydraulic pressure low

WTG-05· 10-25 11:21
Low

Yaw misalignment above limit

WTG-07· 10-25 07:03
Low