WP-2
WashingTrommel · Goldfield Trommel 500 · 150 yd³/h rated · Scroggie Creek
Last seen 05:39:31
Digital twin
Live plant view
Feed, trommel speed, water and hopper level follow live telemetry. Drag to rotate, scroll to zoom.
Washing
Current cut
Cut 7 · Bench 1
Sandy gravel, low clay
Grade
0.022 oz/yd³
Rated capacity
150 yd³/h
Design water
1,500 gpm
Sluice slope
2.2 in/ft
Season runtime
979 h
Last cleanup
10-25 09:19
Next cleanup
in 3h 39m
Process
Live process values
Feed rate
120yd³/h
Process water
1,311gpm
Trommel
9.9rpm
Pump pressure
56psi
Hopper
41%full
Recovery rate
2.61oz/h
Recovery
Gold today
49.6 oz
97%
Yards goal
0.022
Grade
2.61
oz/h
Production
Yards washed today
2,290
yd³ of 2,373 planned · 19.3 h washing since 07:00
Average feed
119 yd³/h
Utilisation
79% of rated
Hours today
19.3 h
Per hour
Yards washed and ounces recovered today
Production day starts at 07:00.
Yards · yd³
Gold · oz
Alarms
Alarms (1)
Trommel drive overcurrent
2026-10-24 13:40
Process history
Feed rate, process water and trommel speed
Feed rate · yd³/h (rated 150)
Process water · gpm
Trommel · rpm